This was an unoccupied building under new construction. The job included new facilities and space that were built specifically for e-One. The project was implemented on a very tight schedule and timeline. Darwin Fisher refit five floors over five months. The designer used was XDesign. The materials used were Milliken carpet tile and Torlys vinyl flooring. Installation was implemented over access flooring. All of the duct work, wiring and electrical were installed under the floor. The floor had to be left accessible so it could be lifted and reinstalled if required. Furthermore, if tiles needed to be moved or new services were required it would make it easy to do so. This was a complex job. There was no time to make errors as Darwin Fisher was juggling small areas, large areas, and electrical and mechanical needs. This was one of more challenging jobs and Darwin Fisher had to work with e-One to be as accommodating as possible. This also included working with all of the other trades. Darwin Fisher had to be very flexible to make sure the project stayed on time and on budget. E-One was thrilled with the final result and the way in which the project was expedited.
Entertainment One
September 4, 2015